loader image
News

Mercomar handle Steel Structure from Hai Phong to Manzanillo

< 1 min read

Project Details:

  • POL: PTSC Sinh Vu Port, Hai Phong
  • POD: Manzanillo
  • Commodities:  Steel structure (main beams for machine x 4 units)
  • Total: 4 X 40FR // 91.250 KGS
  • Dimension: (LxWxH): 13.5 x 2.3m x 2.5m each

Each Steel structure was lashed/ secured from its lashing points to the lashing points of the container by 18 wire ropes Ø16 mm which were reinforced by 18 turnbuckles Ø20mm and 18 shackles Ø16mm along 04 sides of the container.

The wood wedges were used under the machine to prevent the machine from sliding longitudinally. All wire ropes were stretched by turnbuckles with allowable level.

Would you like to see what our members are currently up to?

Follow us and engage with us on:

LinkedIn: https://www.linkedin.com/company/xlprojects-network-xlp/

Facebook: https://www.facebook.com/XLProjectsNetwork/
Twitter: https://twitter.com/XLPNetwork
Instagram: https://www.instagram.com/xlprojectslogisticsnetwork/

 

Recent Post
Introducing Precious Prestige Logistics(PPL): A Leader in Integrated Logistics and Heavy Transportation in Vietnam
News
LS Cargo Logistik A.S. in Istanbul, Turkey joins XLProjects Network (XLP)
News
Bruhat Logistics Executes Breakbulk Transportation of Heavy Construction Equipment from Far East to Middle East
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!