Fairmacs complete load to Bangladesh
XLP member, Fairmacs Multiline, have loaded 26 units of excavators and bulldozers from Kota KinaBalu, East Malaysia to Chittagong, Bangladesh. The total volume was 2900 Cbm with the max weight per lift being 38 tons. The loading took around 66 hours to complete the entire loading.