Safe and Efficient Shipping of Fragile Acrylic Panels for a Miami Resort by FLS Group
FLS Projects Thailand continued to excel at handling 20 tons of 17.8 x 2.65 x 0.8m fragile acrylic panels from Laem Chabang port, Thailand to Miami port, USA. The panels were delivered to a luxury...
Proactive Supply Chain Group Executes Successful Over-Dimensional Transport
Proactive Supply Chain Group in Montréal has successfully transport an over-dimensional sewer vacuum truck from the Port of Montréal, QC to Red Deer, AB. The truck, weighing over 49,000 lbs. and measuring 363" x 117"...
Successful Multimodal (Road + Barge) Movement of Lengthy Columns for an Export Fertilizer Project by Total Movements
This heavylift transportation involved moving a 41-metre-long / 680MT Ammonia Converter and a 30-metre-long / 380MT Ammonia Unitized Chiller from the supplier's factory to the load port by Multi-modal Transportation. Road transportation from the supplier's factory...
Asyad Supply Chain Services SPC in Barka, Oman joins XLProjects Network (XLP)
We are happy to introduce our latest XLProjects (XLP) member office in Barka, Oman. Asyad Supply Chain Services SPC Address: P.O.Box: 85, PC 328, South Al Batinah Governorate, Barka, Oman Tel: +968 22085800 Fax: +968 22085825 Website: https://xlprojects.net/company/asyad-supply-chain-services-spc/ Name: Thenseer Karuppamveettil - Freight...
Aprojects Germany Successfully Ships a Large Machine from Germany to Port Sudan
Aprojects GmbH (formerly Trans-Trading GmbH), a member of the XLProjects (XLP) network, has recently completed the transportation of a large machine from Malschwitz, Germany to Port Sudan. The transportation of the 10.5-ton machine, measuring 8.38...
Aprojects GmbH Arranges Transport from Czech Republic to Germany
Commodity: Turbine Dimension / Weight: 660 x 415 x 390 cm – 71 ton Transport was done by follow lowbed combination: 4-axle Truck + 3-axle Dolly + 5-axle lowbed Trailer Total dimension and weight of...
Aprojects Coordinates Handling of Generator
Generator was delivered to port of Hamburg, Germany by barge. Due to the high weight, the generator cannot unload at any terminal. Aprojects organized a smart solution for the customer, as they used the Hachmannkai...
SaCeMa Nordic Projects cooperates with fellow XLP member, ROHLIG SUUS Logistics S.A.
SaCeMa Nordic Projects and ROHLIG SUUS Logistics S.A. team up to handle relocation of production line from Sweden. The measurements of the total production line is 300 meters in length, the width is 12 meters, the height is 18 meters and...