BATI Innovative Logistics Project Team is busy on the port of Derince, Turkey loading Drilling Machinery to China. All the unpacked cargoes have been carefully loaded from the Port of Derince after a sensitive load plan. In total, the cargoes were over 1000 CBM and more than 400 tons with the longest drilling units measuring at 17 meters long and 35 tons each. Another job well done by BATI Group!