loader image
News

Another heavy load performed by BATI group, this time to Australia

< 1 min read

BATI has performed to engage Main Frame Raptor and Bowl to the vessel which includes pre carriage, warehousing, fumigation, shrink wrapping, lashing and all other necessary services.

The heaviest part of the cargo on skids with 50 tons required special lashing with steel ropes and cables during pre carriage and finally placed to the container vessel as BB after fumigation at Mersin warehouse which took about a week. BATI would like to thank all parties concerned to make it happen.

 

Would you like to see what our members are currently up to?

Follow us and engage with us on:

LinkedIn: https://www.linkedin.com/company/xlprojects-network-xlp/
Facebook: https://www.facebook.com/XLProjectsNetwork/
Twitter: https://twitter.com/XLPNetwork
Instagram: https://www.instagram.com/xlprojectslogisticsnetwork/

Recent Post
Qingdao MingXun International Logistics Co., Ltd. in Qingdao, China joins XLProjects Network (XLP)
News
Sulfate dryers
Xiamen Rosen Shipping Ships Sulfate Dryers from Shanghai to Korea
News
Crystallizer
Xiamen Rosen Shipping Handles Crystallizers Shipment from China to Korea
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!