loader image
News

Successful Transport of 286-Ton Tunnel Drilling Machine from Singapore to Thailand by FLS Projects

2 min read

Commodity:    Tunnel drilling machine

Volume:             10 packages, Gross weight: 286.4 tons; Volume: 589 CBM

Dimension:      Wheel height: 4.65 m/ 98 tons

Front shield height: 4.7 m/75 tons

Tail skin height: 4.68 m/ 30 tons

Origin: Jurong port, Singapore

Destination:    Rayong, Thailand

Description :

  • FLS Projects Singapore: ocean freight from Singapore to Laem Chabang port on a breakbulk vessel
  • FLS Projects Thailand: CIF Laem Chabang port to DDP Rayong
  • Coordinate with the vessel agent and port captain to track and update the status of cargo and complete loading alongside the vessel
  • Deploy the hydraulic trailer for heavy-weight and over-height cargo of 75 tons and 98 tons; low loader trailer with floor height of 40 cm for over-height cargo of 30 tons
  • Conduct a road survey and arrange an escort team to manage cable lifting along the route to overcome the 5-meter road height restriction

 

Recent Post
Port-to-Door Delivery of Critical Oil & Gas Equipment from Saudi Arabia to Singapore
News
Deufol Döhle Projects GmbH in Bremen, Germany joins XLProjects Network (XLP)
News
Across Logistics and Interoceanic Successfully Complete 40 FR OOG Shipment from Spain to Taiwan
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!