loader image
News, Uncategorized

Successful Multimodal (Road + Barge) Movement of Lengthy Columns for an Export Fertilizer Project by Total Movements

2 min read

This heavylift transportation involved moving a 41-metre-long / 680MT Ammonia Converter and a 30-metre-long / 380MT Ammonia Unitized Chiller from the supplier’s factory to the load port by Multi-modal Transportation.

Road transportation from the supplier’s factory to the nearest jetty, rolling-on the two lengthy columns onto the barge, coastal movement to the final load port on the west coast of India and feeding alongside the vessel were all part of their scope.

Major features involved in the challenging move were:
– Felicitous vehicle configuration
– Transporting with civil work enroute
– Rolling-on and securing the cargo on the barge meeting the short tide window
– Double banking operation at Mumbai port.

Both these units were safely delivered at the Indian loading port by Total Movements for further shipping to its destination. All the cargo was delivered in a safe and timely manner, much to the delight of their customer.

Total Movements team would like to express their gratitude to all the stakeholders who supported them in making this shipment a huge success.

Moving Cargo with Passion!
https://totalmove.in/

Recent Post
transportation
PT Total Movements International Executes Seamless Multimodal Movement of Engines & Alternators for a Power Plant Project in Indonesia
News
Destan Global Logistic in Almaty, Kazakhstan joins XLProjects Network (XLP)
News
XLProjects Network (XLP)
Total Movements Delivers Oversized Klin Shells for Steel Plant Project in Persian Gulf
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!