loader image
News

PPL Successfully Handed Over the First 02 Heavy Packages to The Nhon Trach 3&4 Power Plants

1 min read

Nhon Trach 3&4 Thermal Power Plant is the first LNG fuel power in Vietnam. The project was implemented by Petro Vietnam Power Corporation with J/V Samsung C&T and Vietnamese E&C Lilama J/V as EPC. PPL is the project’s transport unit, providing import customs clearance and inland haulage services.

 

It was remarkable in August and September 2023 with the first 02 heavy and most important packages of gas turbine (453.6MT) and transformer (390 MT) were successfully carried and handed over to the project by using SPMT.

 

Package 01:         Turbine

Weight:                453.60 MT

Dimension:         (11.90 x 4.90 x 4.90) m

 

Package 02:         Transformer

Weight:                390.00 MT

Dimension:         (13.10 x 5.00 x 5.80) m

 

Project name:    Nhon Trach 3&4 Thermal Power Plant

Ong Keo IP, Nhon Trach District, Dong Nai Province

Cargo volume:   approx. 1,500 containers, 81,044 RT in bulk including 06 super heavy packages.

Scope of business: Import clearance and inland haulage for the project.

Mode of transport: direct truck for containerized cargoes, combined truck/barge for break bulk shipments, and SPMT for super heavy packages.

Transport distance: 70 km

Recent Post
Go Gauge Logistics Completes Complex Shipment from Italy to India
News
Introducing Precious Prestige Logistics(PPL): A Leader in Integrated Logistics and Heavy Transportation in Vietnam
News
LS Cargo Logistik A.S. in Istanbul, Turkey joins XLProjects Network (XLP)
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!