loader image
News

Total Movements: Multimodal Movement of Heavy-Lift Gas Processing Units for one of the Middle East’s Largest Gas Production Projects

2 min read

XLProjects Network (XLP)

Total Movements successfully executed the door-to-port transportation of 6 Gas Processing Units (GPUs) totaling about 12,800cbm, including the heaviest unit weighing 1,400 MT, from the supplier’s facility in India to the Middle East.

The project involved deploying specialized axle configurations for cargo pick-up and transportation to the load-out jetty, followed by Roll-On operations onto 2 dedicated Deck Carrier Vessels, transportation via the river-sea route, and Roll-Off operations at the discharge port.

Key features included handling ultra-heavy cargo, operating within critical tidal windows, ensuring vessel stability for the 1,400 MT unit, and securing cargo for safe sea transit. To overcome these challenges, our team implemented customized axle configurations, detailed vessel load distribution analysis, precise tidal planning, and MWS-approved sea fastening calculations.

Through meticulous engineering, seamless stakeholder coordination, and strict adherence to HSE standards, every stage of the operation was executed safely, efficiently and on schedule.

Total Movements International Heavy-Lift Total Movements International Heavy-Lift XLProjects Network (XLP) Gas XLProjects Network (XLP) Total Movements International Gas

Recent Post
Magzi Shipping Handles 210,000 MT of Alumina Through Ongoing Breakbulk Project
News
Maxi Cargo Logistics in Swarzędz, Poland joins XLProjects Network (XLP)
News
heavy-lift
Headseaway International Logistics Delivers 66-Ton Transformers from China to Singapore
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!