MSL Transport Excavator Mounted Drilling Rig For a CPEC Project
XLProjects member Msharib Shipping & Logistics (Pvt) Ltd in Karachi recently handled Project cargo related to the Energy development sector for its valued customer, China Harbor Engineering Company.
The cargo had multiple functionality dynamics comprising of pile driving, extracting, auguring, soil mixing, and static pressing on surface and mountains, which makes it heavy and OOG. The cargo weighed 75 MT (Main Body) and 42 MT (Kelly Bars and sub parts) in total weighing 117 MT and having dimensions of 17 x 3.05 x 3.65, 19 x 2.75 x 2.55 respectively.
Team MSL have successfully and professionally coordinated the arrangements of vehicles and documentation as the project required 1 Multi axle Low bed and 1 Flatbed Long Vehicle prior to the assignment to avoid any time lapse to avoid any breach of delivery deadline the customer had.
The movement was planned in 2 phases.
Phase-1: Mansehra to Hubco
Phase-2: Hubco– Tarnol (Islamabad) covering the distance of 1600 Km, resulting to deliver the cargo safe and sound within 5 days.