Mercomar are proud to announce that they have successfully finished their shipment of Gantry Crane. The name of the project is called Pesquería Project. The port of loading was Bilbao, Spain and the port of discharge was Altamira, Mexico. This shipment was the first crane from a total of seven that still needs to be shipped.
The total weight of the crane was 150 tons and with a volume of 950 CMB. The scope of work was 34 meters of long beams, a wooden box, and 5×40’OT. It was then shipped on MV Onego Rio to reach its destination in Altamira, Mexico.
Congratulations to Mercomar on a job well done!