loader image
News

Megalift Transport for East Coast Rail Link (ECRL) Project in Malaysia

2 min read

This month, the Megalift team and equipment are occupied with the handling of shipments for East Coast Rail Link (ECRL) project. They have 6 units of locomotives entering via Kuantan Port and 95 units of wagons that arrived in Port Klang, both via conventional vessels. Their team and equipment have been mobilised to receive the cargoes and deliver them in batches to Kuantan for the installation to take place.

 

 

 

 

 

 

 

 

 

 

 

 

Cargo: Locomotive (6 units)

Dimension: L22.00 m x W3.30 m x H4.74 m

Weight: 150 ton each

 

 

 

 

 

 

 

 

 

 

 

 

Cargo: Wagons (95 units)

Dimension: L14.10 m x W3.18 m x H1.43 m

Weight: 24 ton each

Simultaneously, they are also handling the import of Tamping Machines via Port Klang and 12,000 tons of rails via Kuantan Port. It’s certainly a busy month for the team but they are glad to be a part of this 665-km long railway project.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cargo: Tamping Machine

Dimension: L17.00 m x W3.15 m x H3.41 m

Weight: 48 ton

Cargo: Rails (8,000 pieces)

Dimension: L25.00 m

Weight: 1.5 ton each (total 12,000 ton)

Recent Post
XLProjects Network (XLP)
Freight Connection Pakistan Handles 135-Metric-Ton Waste Heat Boiler Import from Belgium
News
ICS | Central America & Caribbean in Guatemala, El Salvador, Nicaragua, Belize and Honduras join XLProjects Network (XLP)
News
Manuport Logistics
Manuport Logistics Handles 10 Mobile Homes Shipment from Spain to Romania
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!