loader image
News

Manuport Logistics Executes Complex FPSO Oil & Gas Skid Transport Operation

2 min read

FPSO Skid

What Project Cargo Operation Was Completed by Manuport Logistics?

Manuport Logistics, a member of the XLProjects Network (XLP), recently completed the transportation of an Oil & Gas skid for an FPSO project through a highly engineered heavy transport operation. With zero margin for error, the shipment involved a transport height of nearly 8 M, requiring several weeks of detailed planning, route engineering, and continuous operational supervision to ensure safe cargo movement.

How Was the Heavy Transport Operation Executed?

Manuport Logistics used a specialized trailer configuration, featuring a powerful prime mover combined with a modular trailer set-up with 6 independent axle lines to transport the skid safely.

Because of the cargo’s extreme height (close to 8 meters), detailed route surveys and official approvals were mandatory. High-voltage overhead air cables had to be bypassed twice along the route. The operation also demanded hours of technical drawings, extensive engineering calculations, and a dedicated on-field supervisor following the entire circuit to manage execution in real time.

This successful project clearly highlights Manuport Logistics’ expertise in handling CAPEX-driven complex logistics and heavy project cargo for the Oil & Gas and Energy sectors.

Project Shipment Details

Item Details
Cargo Oil & Gas Skid for FPSO
Cargo Type Oversized Project Cargo (Zero Margin for Error)
Transport Height Nearly 8 M
Equipment Used Powerful Prime Mover + Modular Trailer
Trailer Configuration 6 Independent Axle Lines
Key Challenges Overhead High-Voltage Cable Bypass (Twice), Route Surveys & Approvals, Hours of Technical Drawings & Engineering Calculations
On-Site Control Dedicated On-Field Supervisor Managing Real-Time Execution
Industry Sector Oil & Gas / Energy / CAPEX-driven Logistics

 

Summary

Manuport Logistics successfully completed a highly complex FPSO skid transport operation involving nearly 8 M transport height and specialized engineering requirements. Through weeks of detailed planning, technical route analysis, and real-time on-field supervision, the company ensured safe and efficient delivery of the oversized cargo.

Source: https://www.linkedin.com/feed/update/urn:li:activity:7460042202971533313/

FPSO Skid

Recent Post
Total One Logistics Teams Up with Sea Cargo Logistics for Two Antonov Charters from Colombia to the USA
Total One Logistics Inc. Collaborates with Sea Cargo Logistics to Deliver Two Antonov Charters Ahead of Deadline
News
VIA Logistic Group in Peru, Colombia joins XLProjects Network (XLP)
News
Balena Projects Coordinates 55-Ton Conveyor Belt Shipment from Ohio to Brazil
Balena Projects Coordinates 55-Ton Conveyor Belt Shipment from Ohio to Brazil
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!