loader image
News

International Freight Transport Moves Airport Bridges and Component Parts from Florida, USA to Aruba

< 1 min read

International Freight Transport had recently transported 2 airport bridges and component parts – they were shipped in 2 breakbulk units and 4 flatracks.

The size of the units was 690 x143 x144 cm and the weight was 49,000 LBs each.

Port of Loading: Port Everglades in Florida, USA

Port of Discharge: Port of Oranjestad in Aruba

There were many challenges in the process of finishing this move. One of their loaded trucks caught on fire, one driver got into a wreck, and another driver broke down on the way to the port just barely arriving in time.

Small carriers and multiple parties involved made coordination of the move more difficult. The short transit time to the destination put a rush on customs clearance, ensuring payments were made, and getting all documents in order. Despite all the obstacles above, International Freight Transport had successfully accomplished their job.

Recent Post
Freight Logistic Colombia in Medellin, Colombia joins XLProjects Network (XLP)
News
Comodality Finland Oy in Helsinki, Finland Rejoins XLProjects Network (XLP)
News
Go Gauge Logistics
Go Gauge Logistics Executes Heavy Lift Project: Port Marghera to Mumbai
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!