HNX has successfully handled three transformers from Masan, South Korea to New Castle, Australia.
The total volume of the transformer was 1,430 CBM. The heaviest unit had a dimension of L 8,750 x W 4,650 x H 4,200 mm and weighted 125.9 MT, HNX handled two units of this. The third transformer had a dimension of L 5,930 x W 3,780 x H 4,330 mm and weighed 78.8 MT.