loader image
News

Global Logistics Projects Transports Chemical Plant Equipment from the Netherlands to Bangladesh – Successful Negotiation Resulted in Big Saving

< 1 min read

Global Logistics Projects recently transported 29 packages of chemical plant equipment from the Netherlands to Bangladesh. The gross weight was 79,347 kgs and the volume of the shipment was 413.1 m3.

Port of Loading: Port of Rotterdam, Netherlands

Port of discharge: Port of Chittagong, Bangladesh

This move was quite a challenging move because the shipping case was 420 cm height, and all the container shipping lines declined this load as 40’FR FCL/FCL. Due to their good relationship with CMA CGM project division, Global Logistics Projects showed and explained to them that such a FR can be loaded with chains, not possible with regular container spreader.

The result: big advantage for their client – the negotiation resulted in a saving of 55,000 – 70,000 USD because otherwise they would have booked this under breakbulk.

Recent Post
Bruhat Logistics
BRUHAT LOGISTICS MOVES HEAVY EQUIPMENT FROM EUROPE TO UAE
News
Mannlines Logistics in Rotterdam, Netherlands joins XLProjects Network (XLP)
News
Punto System
Delivering Excellence in Project Cargo: Punto System moved an industrial plant from Italy to Egypt
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!