loader image
News

Freight Connection complete 12 MW Waste Heat Power Generation System Project

2 min read

Freight Connection Pakistan Pvt. Ltd has done yet another special Project of 12 MW WASTE HEAT POWER GENERATION SYSTEM ALONGWITH WHR-PLANT INTEGRATION SOLUTION being installed in District Punjab covering completed handling from POL (Shanghai) till POD (Karachi) of steel structure and assembly components of the power generation system, distance from Karachi till Site is approximate 1283 Kms.

Role of Freight Connection Pakistan:

Right from Shanghai Port till final destination, Freight Connection Pakistan handled the project which was a real challenge during this COVID-19 outbreak, and handling such complex cargo of high-quality steel structure and assembly components of this plant is always been difficult task to arrange within a given time frame. Their dedicated Project team has made it possible by making close coordination with a foreign agent and worked non-stop to make it successful.

Project Details:

2850 CBM cargo inclusive of the followings

  • Containers (35×40’)
  • Steel Structure
  • Construction material
  • Equipment of Plant and Machinery

Would you like to see what our members are currently up to?

Follow us and engage with us on:

LinkedIn: https://www.linkedin.com/company/xlprojects-network-xlp/
Facebook: https://www.facebook.com/XLProjectsNetwork/
Twitter: https://twitter.com/XLPNetwork
Instagram: https://www.instagram.com/xlprojectslogisticsnetwork/

Recent Post
Racing Cargo in Mexico joins XLProjects Network (XLP)
News
Khimji Ramdas Shipping
Khimji Ramdas Shipping- Projects and Multimodal Logistics successfully relocates 97-ton Transformers and accessories in Oman
News
Freight Traders Ltd
SaCeMa Nordic Projects and Freight Traders Deliver Heavy Lift Cargo from Sweden to New Zealand
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!