loader image
News

FLS update for the HALGO Power Project in the US

< 1 min read

FLS update for the HALGO Power Project in the US

The 190 MT Boiler, which was shipped from Masan, South Korea last month, has now arrived in New Orleans, USA. Team FLS Projects USA completed the discharging operation directly onto a barge alongside the vessel – as expected, without any incident. FLS thanks Team USA for a smooth delivery.

Recent Post
XLProjects Network (XLP)
Freight Connection Pakistan Handles 135-Metric-Ton Waste Heat Boiler Import from Belgium
News
ICS | Central America & Caribbean in Guatemala, El Salvador, Nicaragua, Belize and Honduras join XLProjects Network (XLP)
News
Manuport Logistics
Manuport Logistics Handles 10 Mobile Homes Shipment from Spain to Romania
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!