loader image
News

Freight Connection Pakistan Handles 135-Metric-Ton Waste Heat Boiler Import from Belgium

2 min read

XLProjects Network (XLP)

ABOUT PROJECT

Freight Connection Pakistan successfully handled the import project of a Waste Heat Boiler, shipped from Antwerp, Belgium to Karachi, Pakistan. The execution of this project demonstrates our team’s dedication, operational excellence, and commitment to delivering seamless logistics solutions.

 

PROJECT DETAILS
Port of Loading Antwerp, Belgium
Port of Discharge Karachi, Pakistan
Container 01 x 40’ OT
Total Gross Weight 152.527
Total Packages 23
·         1 × 40′ OT — 135 M. tons Heaviest Package Dimension: 2150 × 360 × 374 cm

·         22 General Packages — Spare parts and loose parts

 

Scope of Work:

  • Arranged surveyor onboard for inspection and discharge supervision.
  • Coordinated smooth discharge operations at the port.
  • Handled port-to-port operations efficiently, ensuring smooth coordination from origin to destination.

Summary

Freight Connection Pakistan’s successful handling of the Waste Heat Boiler shipment from Belgium to Pakistan underscores their engineering precision, coordination skills, and client-focused approach.
The project was executed safely, on schedule, and in full compliance with port regulations — setting another milestone in their project logistics portfolio.

 

Heavy Industry Logistics XLProjects Network (XLP) XLProjects Network (XLP) Freight Connection Pakistan (Pvt) Ltd Freight Connection Pakistan (Pvt) Ltd

Recent Post
Allog Group Executes Door-to-Door Brazil–Guatemala Project Cargo Shipment with ICS | Central America & Caribbean
News
Project cargo
Xiamen Rosen Shipping Moves Excavator Shipment from China to Morocco
News
Red Wolf Global South Africa Successfully Ships The Beast 3680 – Bandit Horizontal Grinder from Réunion Island
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!