loader image

SaCeMa Nordic Projects cooperates with fellow XLP member, ROHLIG SUUS Logistics S.A.

Posted on : 15 June 2022

SaCeMa Nordic Projects and ROHLIG SUUS Logistics S.A. team up to handle relocation of production line from Sweden. The measurements of the total production line is 300 meters in length, the width is 12 meters, the height is 18 meters and...

Integral Chile Handles Tour Equipment for the Band, Gorillaz

Posted on : 10 June 2022

Integral Chile undertook the task of handling the tour equipment for the popular electronic band Gorillaz. The band Gorillaz was on tour performing in several Latin American countries. The cargo consisted of their equipment for...

Access World Transports Refinery Components

Posted on : 7 June 2022

Access World completed a heavy lift full charter project from Zhangjiagang, China to Cape Town, South Africa and the commodity was refinery components. The weight and volume of the shipment was 627.91 Tons,  4652.13 CBM...

Star Shipping Works with FLS Indonesia to Move Generators

Posted on : 31 May 2022

Star Shipping Pakistan and FLS Indonesia have worked together to move six brand new Caterpillars Generator Set using 3x FR and 1x 40 HC from Jakarta, Indonesia to Karachi, Pakistan.

Star Shipping Handles Various Projects

Posted on : 9 May 2022

Star Shipping operations team handled various projects during the Eid Festival Holidays. They included cargo from RORO Ship handled at Karachi Port. Cargo Details as below: -Two units of Komatsu with a total weight of...

Precious Prestige Logistics (PPL) Completes the Transport of Heat Recovery Steam Generator (HRSG)

Posted on : 5 May 2022

Precious Prestige Logistics (PPL) performed the loading in and out of four modules of Heat Recovery Steam Generator (HRSG) from Dong Xuyen port to PV Shipyard, Vung Tau in Vietnam. The dimension of the modules...

FOB delivery by Trans Trading

Posted on : 29 April 2022

Trans-Trading GmbH recently arranged FOB Delivery in Bremerhaven Vessel:  M/V  “Annegret” POL: Bremerhaven, Germany POD: Kobe, Japan Terminal: BLG AutoTerminal Bremerhaven FOB Handling of Project – in total 387 tons with 56 packages including two Turbines...

Freight Traders Handles Drilling Rig

Posted on : 22 April 2022

Freight Traders recently completed import and import formalities for another drilling rig. This time to Tauranga port in Central North Island of New Zealand. The rig comprised of 103 packages and weighed a total of...

Megalift Ships Gas Turbine

Posted on : 18 April 2022

Megalift has successfully shipped SGT700 Gas Turbine from Siemens Norrkoping to Port Klang. The gas turbine weighed 86 tons with dimensions of 13.54m (L) x 5.34m, (W) x 4.01m (H). From Siemens Norrkoping to Port...