loader image
News

Conveyor Logistics Limited transports 450MW combined cycle power plant in Bangladesh

2 min read

Conveyor Logistics Limited transports 450MW combined cycle power plant in Bangladesh

XLP member, Conveyor Logistics Limited (CLL), was employed to receive cargo at Ports of Entry (Mongla and Chittagong), inland transportation by road and river, and delivery at site. For some Heavy-lift cargo, especially the Gas Turbine (GT) weighing 306 Tons, Gas Turbine Generator (GTG) weighing 396 Tons, IP and HP Steam Turbines (ST), CLL was responsible for placement of equipment on respective pedestals.

HLs and ODCs were received from mother vessels at Mongla Port on flat barges and were transported by river from Mongla to Ashuganj. The HL and ODC were unloaded from barges by RORO method and hauled to project site by SPMT.

The SoW also included transportation of 15 units of 26.5-meter long and 5-meter wide HRSG modules, weights ranging between 87 Tons and 187 Tons from Mongla Port to temporary storage locations in the plant site.

For unloading cargo from barges by RORO method, CLL had constructed a 900 Ton capacity Temporary Jetty on the bank of Meghna River at Ashuganj, adjacent to the existing power station, which was about 1km from the plant site.

The 1100 Ton capacity Gantry Crane was used for lifting GT, GTG and STs on respective equipment pedestals.

Recent Post
Bao Tin One Member Trading & Logistics Co., Ltd. (PPL)
News
LS Cargo Logistik A.S. in Istanbul, Turkey joins XLProjects Network (XLP)
News
Bruhat Logistics Executes Breakbulk Transportation of Heavy Construction Equipment from Far East to Middle East
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!