loader image
News

Freight Traders Ltd Loads Major Geothermal Power Station Components Bound for New Zealand

2 min read

Geothermal Power

What Is the Scope of This Power Station Project?

Freight Traders Ltd (FTL), a member of the XLProjects Network (XLP), has completed the loading phase of a major geothermal power station shipment bound for New Zealand. This charter marks the first stage of a new power station build, with a total shipment weight of 2,081 tons and a combined volume of 4,564 cubic meters.

The project involves oversized and heavy-lift components that required detailed planning and coordination. As a specialist in project cargo and heavy-lift logistics, Freight Traders Ltd managed the operation with a strong focus on safety, cargo integrity, and schedule control.

What Cargo Was Included in the Shipment?

The shipment comprised key power-generation equipment with significant dimensions and weight. This included six condensers, each weighing 135 tons and measuring 24.808 M by 3.604 M by 3.830 M, along with two vaporizers weighing 113 tons each and measuring 25.164 M by 3.664 M by 3.770 M.

Additionally, 10 heat exchangers were shipped, each weighing more than 70 tons and exceeding 20 M in length. Handling these units required specialized lifting arrangements, detailed stowage planning, and experienced supervision, reflecting the technical demands of complex project logistics operations.

How Is the Overall Logistics Execution Structured?

The geothermal power station project is being executed through a multimodal logistics strategy. The scope includes two time-critical ocean charters, a mix of FCL and LCL shipments, airfreight, and coordinated road and rail transport, supported by storage and border clearance services.

This layered execution highlights the complexity of modern project network operations, where multiple transport modes and regulatory requirements must align. Freight Traders Ltd is overseeing these elements to ensure continuity from origin through final delivery.

Why Is XLProjects Network Collaboration Important?

To support upcoming project phases, Freight Traders Ltd is leveraging its membership in the XLProjects Network (XLP), engaging with fellow members for shipping support from various origins around the world to New Zealand.

This collaboration demonstrates how a global project network strengthens large infrastructure projects through shared expertise, local execution capability, and effective risk mitigation.

How Does This Project Reflect Freight Traders Ltd’s Expertise?

The successful completion of the loading phase reinforces Freight Traders Ltd’s experience in managing heavy-lift and industrial logistics projects. Through modern equipment, proven methodologies, and skilled personnel, the company continues to deliver safe and efficient solutions for high-value, technically demanding cargo.

Project Data Overview

Category Details
Company Freight Traders Ltd (FTL)
Network XLProjects Network (XLP)
Total Weight 2,081 tons
Total Volume 4,564 cubic meters
Cargo Types Condensers, vaporizers, heat exchangers
Key Dimensions Up to 25.164 M length
Destination New Zealand
Industry Geothermal power generation

Summary

This geothermal power station shipment highlights Freight Traders Ltd’s capability to manage large-scale project cargo movements involving oversized and heavy components. Through structured planning and collaboration within the XLProjects Network (XLP), the company has successfully completed the first critical phase of a complex infrastructure project bound for New Zealand.

Geothermal Power

Recent Post
Geothermal Power
Freight Traders Ltd Loads Major Geothermal Power Station Components Bound for New Zealand
News
Lift Voyage
Go Gauge Projects Completes Heavy Lift Voyage Charter From China to India
News
Casadei & Ghinassi S.r.l in Ravenna, Italy joins XLProjects Network (XLP)
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!