ABOUT PROJECT
Freight Connection Pakistan successfully handled the import project of a Waste Heat Boiler, shipped from Antwerp, Belgium to Karachi, Pakistan. The execution of this project demonstrates our team’s dedication, operational excellence, and commitment to delivering seamless logistics solutions.
PROJECT DETAILS | |
Port of Loading | Antwerp, Belgium |
Port of Discharge | Karachi, Pakistan |
Container | 01 x 40’ OT |
Total Gross Weight | 152.527 |
Total Packages | 23 |
· 1 × 40′ OT — 135 M. tons Heaviest Package Dimension: 2150 × 360 × 374 cm
· 22 General Packages — Spare parts and loose parts |
Scope of Work:
- Arranged surveyor onboard for inspection and discharge supervision.
- Coordinated smooth discharge operations at the port.
- Handled port-to-port operations efficiently, ensuring smooth coordination from origin to destination.
Summary
Freight Connection Pakistan’s successful handling of the Waste Heat Boiler shipment from Belgium to Pakistan underscores their engineering precision, coordination skills, and client-focused approach.
The project was executed safely, on schedule, and in full compliance with port regulations — setting another milestone in their project logistics portfolio.