Nosco are proud to be the first company in Egypt to receive heavy-lifts packages up to 700 Tons at Gargoub port which was mainly nominated by their engineering team, and which received its first heavy lift shipment since inaugurated. Shipment is currently stored at port.
Exploring new ports that can receive heavy lifts to minimize the civil works requirements and hence providing competitive commercial proposals was considered one of the main challenges they met.
Crossing approximately 1000 Km with such heavy loads, arranging with different governmental authorities to proceed with all civil works requirements, obtaining necessary transportation permits and arranging for traffic escorts was another challenge that was awaiting them to reach their destination safely.