loader image
News

Trans-Trading Handles Turbine and Generator Set

< 1 min read

Vessel: M/V Annegret

POL: Hamburg, Germany

POD: Gunsan, Südkorea

Terminal: Wallmann Terminal

Trans-Trading GmbH recently coordinated a FOB port handling from Terminal Wallmann of a turbine and generator set. The shipment had 26 packages with a total weight of nearly 395 tons.

One turbine (8,70×6,70×5,15 mtr – 190.0 tons), one generator (9,15×3,43×3,26 mtr – 1,33.0 tons), an oil system (4,88×2,57×3,06 mtr – 7.2 tons) and various accessory boxes were loaded.

Terminal handling started with the first shift (6:50 a.m.) and were finished within early afternoon.

The cooperation with everyone involved was excellent and successful.

 

 

Recent Post
Efficient delivery of oversized cargo to the Port of Gdańsk by Rohlig SUUS Logistics
News
XLProjects Network (XLP)
Freight Connection Pakistan Handles 135-Metric-Ton Waste Heat Boiler Import from Belgium
News
ICS | Central America & Caribbean in Guatemala, El Salvador, Nicaragua, Belize and Honduras join XLProjects Network (XLP)
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!