loader image
News

Trans-Trading Handled Three Turbines

< 1 min read

In January 2021, Trans-Trading successfully completed the shipment of three turbines weighing 117 tons each (measurement 9.05 x 3.30 x 3.34 meters) to Taiwan.

Vessel: Taipei Triumph

Terminal: CTB (Burchardkai), Hamburg

Scope of work:

– Coordination with Barge, Terminal, Carrier, Surveyor

– Export Customs Clearance

– Loading control

– Direct Discharge from Barge via HHLA Floating Crane onto Vessel

The handling of the three turbine was smooth, and the vessel left Hamburg in time for his journey to Kaohsiung, Taiwan.

Recent Post
Efficient delivery of oversized cargo to the Port of Gdańsk by Rohlig SUUS Logistics
News
XLProjects Network (XLP)
Freight Connection Pakistan Handles 135-Metric-Ton Waste Heat Boiler Import from Belgium
News
ICS | Central America & Caribbean in Guatemala, El Salvador, Nicaragua, Belize and Honduras join XLProjects Network (XLP)
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!