loader image
News

Origin Logistics completes two project shipments in one week

2 min read

Origin Logistics are proud to announce that they have completed two project shipments within a week. The first shipment was loaded in Konya, Turkey and shipped to Alger, Algeria via Mersin port. The cargo was a clinker ( L: 5,75 mt / W: 4,25 mt / H: 4,40 mt / Weight: 33.000 kgs) and it was successfully loaded onto a flat rack container at the factory and headed to Mersin port via special low bed.

The Origin Logistics team then charted a slot from a breakbulk vessel for the second shipment. The second shipment were twelve silobus with following dimensions (L:11,5 mt / W:2,55 mt / H: 4.10). They were smoothly loaded on board.

Lashing, securing & dunnage, and crane were handled by their experienced team and suppliers. Their branch manager supervised the entire operations and was present on the field for both shipments.

 

Recent Post
Antwerp Global Shipping
Antwerp Global Shipping Joins Forces with Neele-Vat to Expand Logistics Capabilities
News
FPSO Skid
Manuport Logistics Executes Complex FPSO Oil & Gas Skid Transport Operation
News
Hydromechanical Equipment
Freight Logistic Handles Hydromechanical Equipment Project for Australian Hydroelectric Plant
News

Ready to become a member? Let’s work together

Contact our AiO Logistics Team who will be happy to talk to you!